Siemens Smart Infrastructure Buildings’ Nuremberg site is introducing intelligent robotics into its logistics operations through a partnership between Hellmann Worldwide Logistics and Exotec. The project is intended to automate storage, order fulfilment and the movement of materials within the facility.
Hellmann has operated the warehouse at the Nuremberg site as a full-service logistics provider for Siemens Smart Infrastructure Buildings since 2025. Under the new arrangement, it will work with Exotec on an automated system scheduled to go live in mid-2027, supporting future growth and anticipated annual increases in volumes.
Robots and scalable storage
Autonomous robots will store and retrieve goods and transport totes to picking stations. The system will initially offer around 35,000 storage locations and is designed to scale as demand increases. Storage capacity and picking stations can be added flexibly and with minimal effort, according to the project plan.
The stated aim is to create additional capacity for the site’s expected growth while improving efficiency, quality and space utilisation. The automation is also meant to help the Nuremberg operation handle higher volumes without treating the initial configuration as a fixed ceiling.
The described flow keeps picking stations as part of the operation, with robots delivering totes to them rather than replacing the station-based picking step. That model allows the site to add storage and picking capacity in stages as volumes develop.
Service and growth goals
Daniel Schnuck, director global warehouse at Siemens Smart Infrastructure, said the new automation solution is intended to create a foundation for future growth, continuous operational improvement and a consistently flexible, high level of customer service over the long term.
Siemens Smart Infrastructure Buildings also describes its buildings as capable of dynamically managing energy demand and generation through bidirectional energy flow between on-site generation and storage systems and the external electrical grid. In that context, a smart building can manage supply and demand to help reduce energy waste and greenhouse gas emissions.
The Nuremberg robotics project is separately focused on warehouse automation, but it reflects a broader effort to combine digital management, flexible capacity and logistics execution at a single site. The first phase will centre on autonomous storage and retrieval, tote transport and picking support, with expansion possible as volumes develop.
